Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 190.2 m = 624.0 ft
Main Spans: 13 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: York County [199], Virginia [51]
Owned by National Park Service [66], DOT District: 5
6.4 MILES NORTHWEST OF U.
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 3591 (2007) and Trucks: 1%
Future ADT: 3950 (In 2027
)