STAFFORD ST over CORDILLERAS CREEK (Route: 0)
Num: 35C0050x
Open: no restriction [A]
Built: 1903, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 38
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 9.9 m = 32.5 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Redwood City [60102]: San Mateo County [081], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
NORTH OF 'F' ST
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 27.5 metric ton = 30.3 tons ()
Inventory: 16.5 metric ton = 18.2 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5000 (2010) and Trucks: 15%
Future ADT: 10582 (In 2040 )
STATE ROUTE 82 over CORDILLERAS CREEK (Route: 82)
Num: 35 0001x
Open: no restriction [A]
Built: 1915, Reconstructed: 1937
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 21.2 m = 69.6 ft (5 Lanes) and Out-To-Out: 29.2 m = 95.8 ft for a 21.2 m = 69.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Redwood City [60102]: San Mateo County [081], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SM-082-5.15-RDWC
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 20.1 metric ton = 22.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 15.6 metric ton = 17.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 25000 (2009) and Trucks: 2%
Future ADT: 37565 (In 2037 )
INDUSTRIAL BLVD over CORDILLERAS CREEK (Route: 0)
Num: 35C0049x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 11 m = 36.1 ft
Main Spans: 3 at 3.7 m = 12.1 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 18.4 m = 60.4 ft (4 Lanes) and Out-To-Out: 25.1 m = 82.4 ft for a 18.4 m = 60.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Carlos [65070]: San Mateo County [081], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
NORTH OF 'G' ST
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 27.2 metric ton = 29.9 tons ()
Inventory: 16.2 metric ton = 17.8 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8612 (2018) and Trucks: 15%
Future ADT: 10582 (In 2040 )
U.S. HIGHWAY 101 over CORDILLERAS CREEK (Route: 101)
Num: 35 0019x
Open: no restriction [A]
Built: 1930, Reconstructed: 1971
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 10.1 m = 33.1 ft
Main Spans: 3 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (10 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 38.4 m = 126.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Redwood City [60102]: San Mateo County [081], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SM-101-7.13-RDWC
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 13.5 / H 15 [2]
Operating: 40.5 metric ton = 44.6 tons ()
Inventory: 24.3 metric ton = 26.7 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 195000 (2009) and Trucks: 5%
Future ADT: 256126 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.