Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 213.2 m = 699.5 ft
Main Spans: 5 at 41.9 m = 137.5 ft
Approach Spans: 2
Skew: 40
Width, Roadway: 10.1 m = 33.1 ft (3 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Botetourt County [023], Virginia [51]
Owned by State Highway Agency [01], DOT District: 2
0.10 Rt 43W; 0.08 Rt 43E
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2020 [0320] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4147 (2018) and Trucks: 4%
Future ADT: 5600 (In 2037
)