HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


EVANS AVE over CALTRAIN & UP RR (Route: 0)
Num: 34C0054x
Open: no restriction [A]
Built: 1947, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 3 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 19.5 m = 64.0 ft (4 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by County Highway Agency [02], DOT District: 4
JUST S. OF CESAR CHAVEZ
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design:
Operating: 28.5 metric ton = 31.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.4 metric ton = 21.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 30000 (2016) and Trucks: 10%
Future ADT: 50000 (In 2036 )
U.S. HIGHWAY 101 over CESAR CHAVEZ BLVD (Route: 101)
Num: 34 0034Sx
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 228 m = 748.1 ft
Main Spans: 7 at 42.7 m = 140.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SF-101-2.95-SF
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.8 metric ton = 109.8 tons (Load Factor(LF) [1])
Inventory: 64.2 metric ton = 70.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 12600 (2018) and Trucks: 3%
Future ADT: 25823 (In 2042 )
U.S. HIGHWAY 101 over CESAR CHAVEZ BLVD (Route: 101)
Num: 34 0034x
Open: no restriction [A]
Built: 1951, Reconstructed: 1968
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 190.5 m = 625.0 ft
Main Spans: 10 at 29.3 m = 96.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 36 m = 118.1 ft (8 Lanes) and Out-To-Out: 36.7 m = 120.4 ft for a 36 m = 118.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SF-101-2.92-SF
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.1 metric ton = 62.8 tons (Allowable Stress(AS) [2])
Inventory: 39 metric ton = 42.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 234000 (2019) and Trucks: 3%
Future ADT: 306058 (In 2040 )
CESAR CHVZ OFFRAMP over POTRERO AVENUE (Route: 101)
Num: 34 0115Kx
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 255.7 m = 839.0 ft
Main Spans: 11 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SF-101-2.96-SF
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.6 metric ton = 92.0 tons (Load Factor(LF) [1])
Inventory: 50.2 metric ton = 55.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8000 (2018) and Trucks: 3%
Future ADT: 10760 (In 2042 )
23RD STREET over CALTRAIN (Route: 0)
Num: 34C0091x
Open: no restriction [A]
Built: 2016, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 31.7 m = 104.0 ft
Main Spans: 2 at 17.6 m = 57.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 20.2 m = 66.3 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by Other Local Agencies [25], DOT District: 4
JEO PENNSYLVANIA AVE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 54.1 metric ton = 59.5 tons ()
Inventory: 32.4 metric ton = 35.6 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8000 (2013) and Trucks: 5%
Future ADT: 10202 (In 2040 )
U.S.HIGHWAY 101 over CESAR CHAVEZ BLVD (Route: 101)
Num: 34 0114Jx
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 324.6 m = 1065.0 ft
Main Spans: 11 at 40.5 m = 132.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SF-101-2.95-SF
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.3 metric ton = 77.3 tons (Load Factor(LF) [1])
Inventory: 42.4 metric ton = 46.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8000 (2018) and Trucks: 3%
Future ADT: 10760 (In 2042 )
POTRERO AVE over CESAR CHAVEZ ST (Route: 0)
Num: 34C0021x
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 30.8 m = 101.1 ft
Main Spans: 1 at 27 m = 88.6 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 8.4 m = 27.6 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by County Highway Agency [02], DOT District: 4
OVER CESAR CHAVEZ ST
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 54.1 metric ton = 59.5 tons ()
Inventory: 32.4 metric ton = 35.6 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 32280 (2014) and Trucks: 5%
Future ADT: 25738 (In 2041 )
23RD STREET over U.S. HIGHWAY 101 (Route: 0)
Num: 34 0035x
Open: no restriction [A]
Built: 1953, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 39 m = 128.0 ft
Main Spans: 1 at 37.2 m = 122.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 16 m = 52.5 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Francisco [67000]: San Francisco County [075], California [06]
Owned by State Highway Agency [01], DOT District: 4
04-SF-101-3.37-SF
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.8 metric ton = 95.5 tons (Load Factor(LF) [1])
Inventory: 51.8 metric ton = 57.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4513 (2018) and Trucks: 1%
Future ADT: 7614 (In 2042 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider