Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 80.5 m = 264.1 ft
Main Spans: 4 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Farmington [23752]: St. Francois County [187], Missouri [29]
Owned by State Highway Agency [01], DOT District: 7
S 15 T 36 N R 5 E
Condition
Deck: Very Good [8]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72 metric ton = 79.2 tons (Load Factor(LF) [1])
Inventory: 43.2 metric ton = 47.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4346 (2019) and Trucks: 5%
Future ADT: 6953 (In 2039
)