Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 39.3 m = 128.9 ft
Main Spans: 4 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Park Hills [56272]: St. Francois County [187], Missouri [29]
Owned by City or Municipal Highway Agency [04], DOT District: 7
S 3272 T 36 N R 5 E
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45 metric ton = 49.5 tons (Allowable Stress(AS) [2])
Inventory: 32.4 metric ton = 35.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 3000 (2019) and Trucks: 10%
Future ADT: 4500 (In 2039
)