HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


BU 32 E over FLAT RVR (Route: 32)
Num:5133x
Open: no restriction [A]
Built: 1928, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 49.7 m = 163.1 ft
Main Spans: 5 at 9.9 m = 32.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Elvins [22186]: St. Francois County [187], Missouri [29]
Owned by State Highway Agency [01], DOT District: 7
S 7 T 36 N R 5 E
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 34.2 metric ton = 37.6 tons (Load Factor(LF) [1])
Inventory: 20.7 metric ton = 22.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 10536 (2019) and Trucks: 6%
Future ADT: 17911 (In 2039 )
BU 32 E over MO 32 (Route: 32)
Num:3898x
Open: no restriction [A]
Built: 1993, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 91.4 m = 299.9 ft
Main Spans: 2 at 37.8 m = 124.0 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 16.7 m = 54.8 ft (3 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flat River [24490]: St. Francois County [187], Missouri [29]
Owned by State Highway Agency [01], DOT District: 7
S 7 T 36 N R 5 E
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 71.1 metric ton = 78.2 tons (Load Factor(LF) [1])
Inventory: 42.3 metric ton = 46.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 6198 (2019) and Trucks: 5%
Future ADT: 10536 (In 2039 )
WATTS ST over FLAT RVR (Route: 145)
Num:17177x
Open: no restriction [A]
Built: 1996, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 39.3 m = 128.9 ft
Main Spans: 4 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Park Hills [56272]: St. Francois County [187], Missouri [29]
Owned by City or Municipal Highway Agency [04], DOT District: 7
S 3272 T 36 N R 5 E
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45 metric ton = 49.5 tons (Allowable Stress(AS) [2])
Inventory: 32.4 metric ton = 35.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 3000 (2019) and Trucks: 10%
Future ADT: 4500 (In 2039 )
MO 32 E over SHAW BR (Route: 32)
Num:3927x
Open: no restriction [A]
Built: 1996, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7.3 m = 24.0 ft
Main Spans: 2 at 3.4 m = 11.2 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Francois [64316]: St. Francois County [187], Missouri [29]
Owned by State Highway Agency [01], DOT District: 7
S 3272 T 36 N R 5 E
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons ()
Inventory: 99.9 metric ton = 109.9 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: N/A [N]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2021 [0321] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 3.4 km = 2.1 mi
Traffic
ADT: 5700 (2020) and Trucks: 24%
Future ADT: 9975 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact