HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


SAN PABLO AVE over BNSF RY AND AMTRAK (Route: 0)
Num: 28C0062x
Open: no restriction [A]
Built: 1938, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 129.5 m = 424.9 ft
Main Spans: 13 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pinole [57288]: Contra Costa County [013], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
WEST OF CAROL LANE
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 36.9 metric ton = 40.6 tons (Load Factor(LF) [1])
Inventory: 22.4 metric ton = 24.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10300 (2012) and Trucks: 6%
Future ADT: 24229 (In 2042 )
SAN PABLO AVE over PINOLE CREEK (Route: 0)
Num: 28C0061x
Open: no restriction [A]
Built: 1929, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 25.5 m = 83.7 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pinole [57288]: Contra Costa County [013], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.1 MI E TENNENT AVE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 30.5 metric ton = 33.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23.7 metric ton = 26.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11000 (2012) and Trucks: 6%
Future ADT: 24229 (In 2042 )
HERCULES AVE over BNSF RY (Route: 0)
Num: 28C0445x
Open: no restriction [A]
Built: 1985, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 36.3 m = 119.1 ft
Main Spans: 1 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 19.8 m = 65.0 ft (4 Lanes) and Out-To-Out: 25 m = 82.0 ft for a 16.2 m = 53.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hercules [33308]: Contra Costa County [013], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
AT SAN PABLO AVE
Condition
Deck: Poor [4]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4000 (2012) and Trucks: 2%
Future ADT: 5453 (In 2042 )
TENNENT AVE over PINOLE CREEK (Route: 0)
Num: 28C0133x
Open: no restriction [A]
Built: 1967, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 8.2 m = 26.9 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 11.6 m = 38.1 ft (3 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pinole [57288]: Contra Costa County [013], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.3 MI S SAN PABLO AVE
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.5 metric ton = 19.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8000 (2012) and Trucks: 1%
Future ADT: 22026 (In 2042 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider