Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 129.5 m = 424.9 ft
Main Spans: 13 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pinole [57288]: Contra Costa County [013], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 4
WEST OF CAROL LANE
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 36.9 metric ton = 40.6 tons (Load Factor(LF) [1])
Inventory: 22.4 metric ton = 24.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10300 (2012) and Trucks: 6%
Future ADT: 24229 (In 2042
)