Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.2 m = 122.1 ft
Main Spans: 3 at 15.9 m = 52.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.6 m = 28.2 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 5.8 m = 19.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New Amsterdam [52398]: Harrison County [061], Indiana [18]
Owned by County Highway Agency [02], DOT District: 5
00.10 S OF MAIN(NEW AMSTE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 71.7 metric ton = 78.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 59 metric ton = 64.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 220 (2018) and Trucks: 5%
Future ADT: 360 (In 2038
)