HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


SR 62 over ANDERSON RIVER (Route: 62)
Num:22210x
Open: no restriction [A]
Built: 1999, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 70.7 m = 232.0 ft
Main Spans: 2 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Perry County [123], Indiana [18]
Owned by State Highway Agency [01], DOT District: 6
00.47 W SR 145
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.3 metric ton = 82.8 tons (Load Factor(LF) [1])
Inventory: 44.4 metric ton = 48.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 728 (2004) and Trucks: 10%
Future ADT: 1209 (In 2032 )
I-64 EBL over ANDERSON RIVER (Route: 64)
Num:33950x
Open: no restriction [A]
Built: 1973, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 40.2 m = 131.9 ft
Main Spans: 3 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.3 m = 56.8 ft (3 Lanes) and Out-To-Out: 18.2 m = 59.7 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Perry County [123], Indiana [18]
Owned by State Highway Agency [01], DOT District: 6
00.30 W SR 145
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 58 metric ton = 63.8 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6993 (2004) and Trucks: 10%
Future ADT: 12664 (In 2034 )
I-64 WBL over ANDERSON RIVER (Route: 64)
Num:33960x
Open: no restriction [A]
Built: 1973, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 40.2 m = 131.9 ft
Main Spans: 3 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16 m = 52.5 ft (3 Lanes) and Out-To-Out: 16.9 m = 55.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Perry County [123], Indiana [18]
Owned by State Highway Agency [01], DOT District: 6
00.30 W SR 145
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6993 (2004) and Trucks: 10%
Future ADT: 12664 (In 2034 )
SR 145 over I-64 (Route: 145)
Num:27210x
Open: no restriction [A]
Built: 1973, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 66.4 m = 217.9 ft
Main Spans: 2 at 32.6 m = 107.0 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 14.3 m = 46.9 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Perry County [123], Indiana [18]
Owned by State Highway Agency [01], DOT District: 6
00.21 N SR 62
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 67.1 metric ton = 73.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 484 (2014) and Trucks: 6%
Future ADT: 2285 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider