Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.8 m = 61.7 ft
Main Spans: 1 at 17.9 m = 58.7 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Jefferson County [081], Illinois [17]
Owned by County Highway Agency [02], DOT District: 9
0.9 MI S BELLE RIVE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.1 metric ton = 48.5 tons (Unknown [D])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [D])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.8 km = 1.1 mi
Traffic
ADT: 275 (2016) and Trucks: 3%
Future ADT: 414 (In 2032
)