Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Prestressed concrete continuous [6] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 635.1 m = 2083.8 ft
Main Spans: 3 at 42.7 m = 140.1 ft
Approach Spans: 31
Skew: 0
Width, Roadway: 10.1 m = 33.1 ft (2 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Sacramento County [067], California [06]
Owned by County Highway Agency [02], DOT District: 3
SJ & SAC COUNTY LINE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 671 (2009) and Trucks: 5%
Future ADT: 1101 (In 2042
)