Nearby Bridges in NBI 2021: 10


I 25 ML over SERVICE RD: BNSF RR (Route: 25)
Num:K-18-DCx
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 59.6 m = 195.5 ft
Main Spans: 2 at 37 m = 121.4 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 37.9 m = 124.3 ft (6 Lanes) and Out-To-Out: 39.3 m = 128.9 ft for a 37.2 m = 122.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN PUEBLO
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 48.6 metric ton = 53.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 63000 (2018) and Trucks: 6%
Future ADT: 78750 (In 2038 )
I 25 ML over UPRR (Route: 25)
Num:K-18-DFx
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 48.3 m = 158.5 ft
Main Spans: 2 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 43
Width, Roadway: 37.2 m = 122.1 ft (6 Lanes) and Out-To-Out: 38.6 m = 126.6 ft for a 36.6 m = 120.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
0.25 MI N OF JCT SH 50 E
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 49.9 metric ton = 54.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 38.6 metric ton = 42.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 63000 (2018) and Trucks: 6%
Future ADT: 78750 (In 2038 )
I 25 ML over GRUMA DRIVE (Route: 25)
Num:K-18-DBx
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 35.1 m = 115.2 ft
Main Spans: 1 at 34 m = 111.6 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 45.1 m = 148.0 ft (6 Lanes) and Out-To-Out: 46.7 m = 153.2 ft for a 48 m = 157.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN PUEBLO
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 38.1 metric ton = 41.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 60000 (2019) and Trucks: 6%
Future ADT: 36300 (In 2031 )
I 25 ML over D STREET (Route: 25)
Num:K-18-DGx
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 30.3 m = 99.4 ft
Main Spans: 1 at 28.5 m = 93.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 40.5 m = 132.9 ft (6 Lanes) and Out-To-Out: 41.4 m = 135.8 ft for a 39.6 m = 129.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
0.2 MI N OF JCT SH 50 E
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 66.4 metric ton = 73.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 51.2 metric ton = 56.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 63000 (2018) and Trucks: 6%
Future ADT: 78750 (In 2038 )
Alan Hamel Ave over LAKE ELIZABETH (Route: 0)
Num:PUEGRAND-.1-MAIx
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 1 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.4 m = 60.4 ft (4 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 24
Alan Hamel Ave and Main
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 79.8 metric ton = 87.8 tons (Load Factor(LF) [1])
Inventory: 47.8 metric ton = 52.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4063 (2018) and Trucks: 5%
Future ADT: 5728 (In 2038 )
MAIN STREET over LAKE ELIZABETH (Route: 3105)
Num:PUEMAIN-0.1-Dx
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 26 m = 85.3 ft
Main Spans: 1 at 24.7 m = 81.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 18.3 m = 60.0 ft (5 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 24
0.1 MI NE D ST/River Walk
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 79.9 metric ton = 87.9 tons (Load Factor(LF) [1])
Inventory: 47.8 metric ton = 52.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7114 (2018) and Trucks: 7%
Future ADT: 10030 (In 2038 )
I 25 ML NBND over 1ST ST (Route: 25)
Num:K-18-CNx
Open: no restriction [A]
Built: 1959, Reconstructed: 2019
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 47.4 m = 155.5 ft
Main Spans: 4 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 26.8 m = 87.9 ft (2 Lanes) and Out-To-Out: 28.7 m = 94.2 ft for a 26.8 m = 87.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN PUEBLO
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 48.3 metric ton = 53.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.3 metric ton = 41.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 63000 (2018) and Trucks: 6%
Future ADT: 36300 (In 2031 )
UNION AVENUE over LAKE ELIZABETH (Route: 3101)
Num:PUEUNIN-0.1-Dx
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.9 m = 85.0 ft
Main Spans: 1 at 24.5 m = 80.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 24
River Walk in Pueblo
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 88.8 metric ton = 97.7 tons (Load Factor(LF) [1])
Inventory: 53.2 metric ton = 58.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7897 (2018) and Trucks: 7%
Future ADT: 11135 (In 2038 )
I 25 ML over US 50 BUS. RTE. (Route: 25)
Num:K-18-AXx
Open: no restriction [A]
Built: 1958, Reconstructed: 2016
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 73 m = 239.5 ft
Main Spans: 4 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 54
Width, Roadway: 28 m = 91.9 ft (5 Lanes) and Out-To-Out: 29.9 m = 98.1 ft for a 28 m = 91.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN PUEBLO I25/Santa Fe
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: HL93 [A]
Operating: 47 metric ton = 51.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 36.3 metric ton = 39.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 58000 (2018) and Trucks: 6%
Future ADT: 41175 (In 2031 )
I 25 ML over ARKANSAS RIVER (Route: 25)
Num:K-18-AJx
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 102 m = 334.7 ft
Main Spans: 2 at 50.3 m = 165.0 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 24.4 m = 80.1 ft (5 Lanes) and Out-To-Out: 26.8 m = 87.9 ft for a 25.6 m = 84.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pueblo [62000]: Pueblo County [101], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN PUEBLO
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 33.1 metric ton = 36.4 tons (Load Factor(LF) [1])
Inventory: 19.9 metric ton = 21.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 58000 (2018) and Trucks: 5%
Future ADT: 81405 (In 2028 )