Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.1 m = 33.1 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.2 m = 33.5 ft for a 7 m = 23.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Fremont County [043], Colorado [08]
Owned by State Highway Agency [01], DOT District: 27
18 MI SE OF SALIDA
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 38.8 metric ton = 42.7 tons (Load Factor(LF) [1])
Inventory: 23.2 metric ton = 25.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 3400 (2018) and Trucks: 5%
Future ADT: 3604 (In 2038
)