Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 124.4 m = 408.2 ft
Main Spans: 3 at 27.4 m = 89.9 ft
Approach Spans: 2
Skew: 35
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Cabell County [011], West Virginia [54]
Owned by State Highway Agency [01], DOT District: 2
0.19 MI. EAST OF CR 60/89
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 16750 (2017) and Trucks: 17%
Future ADT: 25795 (In 2037
)