HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


US 54 E over HALIFAX BR (Route: 54)
Num:6589x
Open: no restriction [A]
Built: 1957, Reconstructed: 1978
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 2 at 3.4 m = 11.2 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 0 m = 0.0 ft (5 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Summit [71548]: Callaway County [027], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 10 T 44 N R 11 W
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 92.7 metric ton = 102.0 tons (Load Factor(LF) [1])
Inventory: 54.9 metric ton = 60.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 31988 (2019) and Trucks: 14%
Future ADT: 59177 (In 2039 )
US 54 W over KATY TRAIL (Route: 54)
Num:6590x
Open: no restriction [A]
Built: 1957, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 44.5 m = 146.0 ft
Main Spans: 3 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 11.2 m = 36.7 ft (2 Lanes) and Out-To-Out: 12 m = 39.4 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Summit [71548]: Callaway County [027], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 10 T 44 N R 11 W
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 43.2 metric ton = 47.5 tons (Load Factor(LF) [1])
Inventory: 26.1 metric ton = 28.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 16949 (2019) and Trucks: 17%
Future ADT: 31355 (In 2039 )
US 54 E over KATY TRAIL (Route: 54)
Num:2951x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 49.7 m = 163.1 ft
Main Spans: 3 at 16.6 m = 54.5 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Jefferson City [37000]: Callaway County [027], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 10 T 44 N R 11 W
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.4 metric ton = 75.2 tons (Load Factor(LF) [1])
Inventory: 34.2 metric ton = 37.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 15039 (2019) and Trucks: 14%
Future ADT: 27822 (In 2039 )
S SUMMIT DR S over US 54 (Route: 0)
Num:2950x
Open: no restriction [A]
Built: 1977, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 83.2 m = 273.0 ft
Main Spans: 2 at 37 m = 121.4 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Summit [71548]: Callaway County [027], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 10 T 44 N R 11 W
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 43.2 metric ton = 47.5 tons (Allowable Stress(AS) [2])
Inventory: 26.1 metric ton = 28.7 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2569 (2019) and Trucks: 6%
Future ADT: 4238 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider