Nearby Bridges in NBI 2021: 15


SPRUCE ST over METROLINK (Route: 0)
Num:35299x
Posted for load [P]
Built: 2016, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 17.1 m = 56.1 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 17.1 m = 56.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by Other Local Agencies [25], DOT District: 5
S 363 T 45 N R 7 E
Condition
Deck: Very Good [8]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design:
Operating: 59.4 metric ton = 65.3 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 45.9 metric ton = 50.5 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2081 (2020) and Trucks: 2%
Future ADT: 2809 (In 2040 )
RP 6TH ST TO IS64E over CST BROADWAY (Route: 0)
Num:31443x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 155.7 m = 510.9 ft
Main Spans: 5 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Excellent [9]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 81.9 metric ton = 90.1 tons (Load Factor(LF) [1])
Inventory: 49.5 metric ton = 54.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5900 (2019) and Trucks: 18%
Future ADT: 7375 (In 2039 )
RP IS64W TO CLARK over CST SPRUCE ST: METROLINK (Route: 0)
Num:1256x
Posted for load [P]
Built: 1966, Reconstructed: 2009
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 332.8 m = 1091.9 ft
Main Spans: 11 at 27.3 m = 89.6 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 7.4 m = 24.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 40.5 metric ton = 44.6 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 2751 (2019) and Trucks: 18%
Future ADT: 3438 (In 2039 )
RP BROADWAY TO IS6 over RP IS64E TO 6TH ST (Route: 0)
Num:1257x
Posted for load [P]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 225.9 m = 741.2 ft
Main Spans: 9 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 7.4 m = 24.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 13 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36.9 metric ton = 40.6 tons (Load Factor(LF) [1])
Inventory: 22.5 metric ton = 24.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 3892 (2019) and Trucks: 18%
Future ADT: 4865 (In 2039 )
RP IS64E TO 6TH ST over 8TH STREET (Route: 0)
Num:1258x
Posted for load [P]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 145.4 m = 477.1 ft
Main Spans: 6 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 7.4 m = 24.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 13 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 37.8 metric ton = 41.6 tons (Load Factor(LF) [1])
Inventory: 22.5 metric ton = 24.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 5215 (2019) and Trucks: 18%
Future ADT: 6518 (In 2039 )
RP 10TH ST TO IS64 over CST SPRUCE ST (Route: 0)
Num:1259x
Posted for load [P]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 303.6 m = 996.1 ft
Main Spans: 10 at 29.3 m = 96.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 7.4 m = 24.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.1 metric ton = 48.5 tons (Load Factor(LF) [1])
Inventory: 27 metric ton = 29.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 4503 (2019) and Trucks: 19%
Future ADT: 5628 (In 2039 )
RP IS64E TO 11TH S over RR PRIVATE ENTRANC (Route: 0)
Num:1260x
Posted for load [P]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 107.3 m = 352.1 ft
Main Spans: 8 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.3 metric ton = 56.4 tons (Load Factor(LF) [1])
Inventory: 30.6 metric ton = 33.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 5638 (2019) and Trucks: 18%
Future ADT: 7047 (In 2039 )
TUCKER BLVD over TRRA & UP RR (Route: 0)
Num:13140x
Posted for load [P]
Built: 1979, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 432.8 m = 1420.0 ft
Main Spans: 18 at 36 m = 118.1 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 20.7 m = 67.9 ft (6 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 4.85 m = 15.9 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by City or Municipal Highway Agency [04], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.7 metric ton = 62.4 tons (Allowable Stress(AS) [2])
Inventory: 37.8 metric ton = 41.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 21000 (2018) and Trucks: 5%
Future ADT: 28350 (In 2038 )
IS 55 N over CST 2ND ST (Route: 55)
Num:35368x
Open: no restriction [A]
Built: 2016, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 95.1 m = 312.0 ft
Main Spans: 3 at 26.8 m = 87.9 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 11.8 m = 38.7 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Excellent [9]
Loading
Design:
Operating: 66.6 metric ton = 73.3 tons (Load Factor(LF) [1])
Inventory: 39.6 metric ton = 43.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 24297 (2019) and Trucks: 12%
Future ADT: 30371 (In 2039 )
RP IS55S TO IS44E over RP IS44E TO MEMORIAL DR (Route: 0)
Num:34667x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 77.1 m = 253.0 ft
Main Spans: 2 at 38.1 m = 125.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 6.9 m = 22.6 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design:
Operating: 77.4 metric ton = 85.1 tons (Load Factor(LF) [1])
Inventory: 46.8 metric ton = 51.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 13420 (2019) and Trucks: 18%
Future ADT: 16775 (In 2039 )
WALNUT ST E over IS 44 (Route: 0)
Num:34444x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 29.6 m = 97.1 ft
Main Spans: 1 at 28.7 m = 94.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 25.4 m = 83.3 ft (3 Lanes) and Out-To-Out: 30.5 m = 100.1 ft for a 9.3 m = 30.5 ft approaching roadway.
Vertical Clearance: 5.05 m = 16.6 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 24 T 45 N R 7 E
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 76.5 metric ton = 84.2 tons (Load Factor(LF) [1])
Inventory: 45.9 metric ton = 50.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8319 (2019) and Trucks: 10%
Future ADT: 12478 (In 2039 )
IS 64 W over IS 64: CST 4TH ST: CST B (Route: 64)
Num:1246x
Posted for load [P]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 2391.8 m = 7847.5 ft
Main Spans: 6 at 77.6 m = 254.6 ft
Approach Spans: 77
Skew: 7
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 34.2 metric ton = 37.6 tons (Load Factor(LF) [1])
Inventory: 20.7 metric ton = 22.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 52775 (2019) and Trucks: 18%
Future ADT: 65968 (In 2039 )
IS 55 S over RP MEMORIAL DR TO IS44W: (Route: 55)
Num:34664x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 272.8 m = 895.1 ft
Main Spans: 4 at 43.3 m = 142.1 ft
Approach Spans: 6
Skew: 24
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 11.8 m = 38.7 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design:
Operating: 55.8 metric ton = 61.4 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 42.3 metric ton = 46.5 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 13420 (2019) and Trucks: 18%
Future ADT: 16775 (In 2039 )
IS 64 E over IS 44: CST TUCKER BLVD:: (Route: 64)
Num:1245x
Posted for load [P]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 2391.8 m = 7847.5 ft
Main Spans: 6 at 75.6 m = 248.0 ft
Approach Spans: 78
Skew: 6
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 4.55 m = 14.9 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 23 T 45 N R 7 E
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 38.7 metric ton = 42.6 tons (Load Factor(LF) [1])
Inventory: 23.4 metric ton = 25.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 46829 (2019) and Trucks: 12%
Future ADT: 58536 (In 2039 )
RP S 7TH BLVD TO I over FILL (Route: 0)
Num:2827x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 49.7 m = 163.1 ft
Main Spans: 3 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.1 m = 26.6 ft (1 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Louis [65000]: St. Louis city [510], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 26 T 45 N R 7 E
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.7 metric ton = 62.4 tons (Load Factor(LF) [1])
Inventory: 34.2 metric ton = 37.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 8051 (2019) and Trucks: 19%
Future ADT: 10063 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.