Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 690.6 m = 2265.9 ft
Main Spans: 5 at 100 m = 328.1 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 27.7 m = 90.9 ft (4 Lanes) and Out-To-Out: 33.9 m = 111.2 ft for a 27.7 m = 90.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Folsom [24638]: Sacramento County [067], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.3 MI SOUTH OF GREENBACK
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 25000 (2016) and Trucks: 7%
Future ADT: 29141 (In 2042
)