Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 113 m = 370.8 ft
Main Spans: 3 at 39.4 m = 129.3 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 39.9 m = 130.9 ft (7 Lanes) and Out-To-Out: 40.8 m = 133.9 ft for a 36.6 m = 120.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fountain [27865]: El Paso County [041], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
JUST E. OF SECURITY INT.
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 29.2 metric ton = 32.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.7 metric ton = 25.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 37000 (2018) and Trucks: 3%
Future ADT: 31400 (In 2031
)