Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 86.9 m = 285.1 ft
Main Spans: 1 at 53.3 m = 174.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 4.51 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Washington County [175], Indiana [18]
Owned by State Highway Agency [01], DOT District: 5
01.92 E SR 39
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 533 (2004) and Trucks: 10%
Future ADT: 934 (In 2030
)