CANON AVE over FOUNTAIN CREEK (Route: 0)
Num:MANITOU-CANONx
Open: no restriction [A]
Built: 1906, Reconstructed: 1990
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.7 m = 22.0 ft
Main Spans: 1 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 8.8 m = 28.9 ft (1 Lanes) and Out-To-Out: 13.5 m = 44.3 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Manitou Springs [48445]: El Paso County [041], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 24
.1 MI N OF MANITOU AVENUE
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 27.2 metric ton = 29.9 tons ()
Inventory: 16.3 metric ton = 17.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1622 (2017) and Trucks: 1%
Future ADT: 2579 (In 2037 )
PARKING LOT ACCESS over FOUNTAIN CREEK (Route: 0)
Num:MANITOU-PARKINGx
Posted for load [P]
Built: 1932, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14.2 m = 46.6 ft
Main Spans: 1 at 13.1 m = 43.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.3 m = 37.1 ft (2 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Manitou Springs [48445]: El Paso County [041], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 24
JUST N OF MANITOU STREET
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 5.4 metric ton = 5.9 tons ()
Inventory: 2.7 metric ton = 3.0 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 567 (2017) and Trucks: 0%
Future ADT: 901 (In 2037 )
US 24 ML over WILLIAMS CANYON: RDWY (Route: 24)
Num:I-17-GNx
Open: no restriction [A]
Built: 1969, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 104.9 m = 344.2 ft
Main Spans: 3 at 51.8 m = 170.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 21.3 m = 69.9 ft (4 Lanes) and Out-To-Out: 22.7 m = 74.5 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Manitou Springs [48445]: El Paso County [041], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
IN MANITOU SPRINGS
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 25 metric ton = 27.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 6100 (2018) and Trucks: 4%
Future ADT: 6344 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.