Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7.8 m = 25.6 ft
Main Spans: 1 at 6.9 m = 22.6 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Jackson County [071], Indiana [18]
Owned by State Highway Agency [01], DOT District: 5
SR 250 1.40 E US 50
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: HL93 [A]
Operating: 67.1 metric ton = 73.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 63.5 metric ton = 69.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 2502 (2017) and Trucks: 17%
Future ADT: 3053 (In 2037
)