Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.7 m = 127.0 ft
Main Spans: 1 at 29.6 m = 97.1 ft
Approach Spans: 1
Skew: 36
Width, Roadway: 21.3 m = 69.9 ft (4 Lanes) and Out-To-Out: 22.7 m = 74.5 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: El Paso County [041], Colorado [08]
Owned by State Highway Agency [01], DOT District: 24
3.4 MI SE OF PIKES PEAK-T
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.1 metric ton = 58.4 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 32000 (2018) and Trucks: 4%
Future ADT: 43940 (In 2031
)