Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 8.4 m = 27.6 ft
Main Spans: 1 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 4.3 m = 14.1 ft (1 Lanes) and Out-To-Out: 4.9 m = 16.1 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Gilmer County [021], West Virginia [54]
Owned by State Highway Agency [01], DOT District: 7
0.16 MI E OF CO 17
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.5 metric ton = 80.9 tons (Load Factor(LF) [1])
Inventory: 44.4 metric ton = 48.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 221 (2015) and Trucks: 8%
Future ADT: 267 (In 2035
)