HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 11


E RAMP TO WH FRWY over STORAGE YD NEAR POTOMAC (Route: 29)
Num:0007(EAST RAMP)x
Open: no restriction [A]
Built: 1956, Reconstructed: 2007
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 86 m = 282.2 ft
Main Spans: 7 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
KEY BRIDGE OVER POTOMAC R
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Allowable Stress(AS) [2])
Inventory: 33.6 metric ton = 37.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20000 (2007) and Trucks: 3%
Future ADT: 30000 (In 2030 )
Key Bridge over WHITEHURST FRWY (Route: 29)
Num:7x
Open: no restriction [A]
Built: 1925, Reconstructed: 1986
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 529.9 m = 1738.6 ft
Main Spans: 8 at 63.4 m = 208.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 20.1 m = 65.9 ft (6 Lanes) and Out-To-Out: 27.4 m = 89.9 ft for a 20.1 m = 65.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 22 m = 72.2 ft
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
WHITEHURST FRWY
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 62000 (2007) and Trucks: 3%
Future ADT: 65000 (In 2027 )
ROUTE 29 over C&O CANAL: N.W. (Route: 29)
Num:0032(TO KEY BR)x
Open: no restriction [A]
Built: 1949, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 28.7 m = 94.2 ft
Main Spans: 1 at 28.7 m = 94.2 ft
Approach Spans: 0
Skew: 62
Width, Roadway: 17.4 m = 57.1 ft (5 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 3 m = 9.8 ft
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
RAMP OVER C&O CANAL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 31200 (2006) and Trucks: 2%
Future ADT: 32500 (In 2026 )
ROUTE 29 over POTMC RV;RF&P & BN CANAL (Route: 29)
Num:152x
Open: no restriction [A]
Built: 1925, Reconstructed: 1986
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 529.9 m = 1738.6 ft
Main Spans: 8 at 63.4 m = 208.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 20.1 m = 65.9 ft (6 Lanes) and Out-To-Out: 27.4 m = 89.9 ft for a 20.1 m = 65.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 22 m = 72.2 ft
Location
Unknown [00000]: Arlington County [013], Virginia [51]
Owned by State Highway Agency [01], DOT District: 9
0.0 ARL CO & 0.0 DC LINE
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 62000 (2006) and Trucks: 3%
Future ADT: 65000 (In 2026 )
CONNECTOR RAMP TO over GWMP (SB) (Route: 509)
Num:3300012P0000000x
Open: no restriction [A]
Built: 1959, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 40.8 m = 133.9 ft
Main Spans: 1 at 40.8 m = 133.9 ft
Approach Spans: 0
Skew: 67
Width, Roadway: 8.1 m = 26.6 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Arlington County [013], Virginia [51]
Owned by National Park Service [66], DOT District: 9
8.4 MILES SOUTH OF I-495.
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 74.4 metric ton = 81.8 tons (Load Factor(LF) [1])
Inventory: 44.5 metric ton = 49.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 16100 (2013) and Trucks: 1%
Future ADT: 17710 (In 2033 )
NORTH LYNN STREET over I-66_ROSSLYN TUNNEL (Route: 0)
Num:73x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 31.7 m = 104.0 ft
Main Spans: 2 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 19.2 m = 63.0 ft (5 Lanes) and Out-To-Out: 25 m = 82.0 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Arlington County [013], Virginia [51]
Owned by State Highway Agency [01], DOT District: 9
00.02FR29SBL/00.02TO29NBL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.9 metric ton = 75.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 53.5 metric ton = 58.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14838 (2018) and Trucks: 2%
Future ADT: 17736 (In 2035 )
FORT MYER DRIVE over I-66__ROSSLYN TUNNEL (Route: 0)
Num:71x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 34.7 m = 113.9 ft
Main Spans: 2 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 63
Width, Roadway: 15.5 m = 50.9 ft (3 Lanes) and Out-To-Out: 21.6 m = 70.9 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 4.65 m = 15.3 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Arlington County [013], Virginia [51]
Owned by State Highway Agency [01], DOT District: 9
00.02FR29NBL/00.02TO29SBL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 82.9 metric ton = 91.2 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 22450 (1987) and Trucks: 1%
Future ADT: 106980 (In 2035 )
WHITEHURST FRWY over K Street: N.W. (Route: 29)
Num:32x
Open: no restriction [A]
Built: 1949, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 1271.6 m = 4172.1 ft
Main Spans: 76 at 23.2 m = 76.1 ft
Approach Spans: 18
Skew: 99
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 18.9 m = 62.0 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 4.22 m = 13.8 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
GEORGETOWN WATERFRONT: NW
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 31200 (2006) and Trucks: 4%
Future ADT: 32500 (In 2026 )
NORTH NASH ST. over I-66_ROSSLYN TUNNEL (Route: 0)
Num:69x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 31.4 m = 103.0 ft
Main Spans: 2 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 15.3 m = 50.2 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Arlington County [013], Virginia [51]
Owned by State Highway Agency [01], DOT District: 9
00.01FR29SB/00.01TO29NB
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.4 metric ton = 85.1 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 59.7 metric ton = 65.7 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2510 (2018) and Trucks: 3%
Future ADT: 2767 (In 2035 )
31ST STREET N.W. over C&O CANAL (Route: 0)
Num:3x
Posted for load [P]
Built: 0, Reconstructed: 1929
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 12.1 m = 39.7 ft
Main Spans: 2 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 14.8 m = 48.6 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 3 m = 9.8 ft
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
GEORGETOWN & C&O
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Serious [3]
Loading
Design:
Operating: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Inventory: 20.9 metric ton = 23.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1000 (2007) and Trucks: 1%
Future ADT: 1000 (In 2027 )
WISCONSIN AVENUE over C&O CANAL (Route: 0)
Num:2x
Open: no restriction [A]
Built: 1831, Reconstructed: 2006
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 18.3 m = 60.0 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 15.5 m = 50.9 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: District of Columbia [001], District of Columbia [11]
Owned by State Highway Agency [01], DOT District: 1
GEORGETOWN & C&O
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 67.1 metric ton = 73.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7400 (2006) and Trucks: 1%
Future ADT: 8500 (In 2026 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider