Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 55.8 m = 183.1 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 48
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Columbia [15670]: Boone County [019], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 5 T 48 N R 12 W
Condition
Deck: Serious [3]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 41.4 metric ton = 45.5 tons (Load Factor(LF) [1])
Inventory: 25.2 metric ton = 27.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 12
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 2787 (2019) and Trucks: 5%
Future ADT: 4598 (In 2039
)