Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 28.2 m = 92.5 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 12.1 m = 39.7 ft approaching roadway.
Vertical Clearance: 30.47 m = 100.0 ft and Navigational Clearance: 0 = N/A
Location
Topeka [71000]: Shawnee County [177], Kansas [20]
Owned by City or Municipal Highway Agency [04], DOT District: 1
187.691m W. of SW49th & T
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 84.2 metric ton = 92.6 tons (Load Factor(LF) [1])
Inventory: 50.3 metric ton = 55.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Scour calculation/evaluation has not been made. [6]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 500 (2019) and Trucks: 10%
Future ADT: 586 (In 2035
)