Bridge Type
Main Span(s): Aluminum: Wrought Iron or Cast Iron [9] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.4 m = 24.3 ft
Main Spans: 2 at 3.4 m = 11.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 5.8 m = 19.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Ripley County [137], Indiana [18]
Owned by County Highway Agency [02], DOT District: 5
00.52 S OF HOPEWELL RD
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.8 metric ton = 66.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 55.3 metric ton = 60.8 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 140 (2016) and Trucks: 4%
Future ADT: 180 (In 2036
)