HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 14


US50 EB over NSRR;CSRR;LINN STREET (Route: 50)
Num:3103064x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 239 m = 784.2 ft
Main Spans: 8 at 45.1 m = 148.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 15.9 m = 52.2 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.4 MI E OF I75
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 32.4 metric ton = 35.6 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20193 (2015) and Trucks: 6%
Future ADT: 28028 (In 2038 )
FREEMAN AVE over US50(2SR);CRR;CSRR;DL ST (Route: 0)
Num:3102971x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 215.2 m = 706.1 ft
Main Spans: 11 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 21.1 m = 69.2 ft for a 22.9 m = 75.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.5 MI W OF I75
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5862 (2015) and Trucks: 7%
Future ADT: 53713 (In 2038 )
US50 WB over NSRR;CSRR;LINN STREET (Route: 50)
Num:3103005x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 242.3 m = 795.0 ft
Main Spans: 9 at 45.4 m = 149.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 15.9 m = 52.2 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.4 MI W OF I75
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 19349 (2015) and Trucks: 6%
Future ADT: 26856 (In 2038 )
US50 EB over NORFOLK SOUTHERN RR (Route: 50)
Num:3102920x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 68 m = 223.1 ft
Main Spans: 5 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.6 MI W OF IR 75
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 22589 (2015) and Trucks: 6%
Future ADT: 31354 (In 2038 )
US50 WB over NORFOLK SOUTHERN RR (Route: 50)
Num:3102912x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 68 m = 223.1 ft
Main Spans: 5 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 18.9 m = 62.0 ft (4 Lanes) and Out-To-Out: 20 m = 65.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.6 MI W OF I75
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 22589 (2015) and Trucks: 6%
Future ADT: 31354 (In 2038 )
US50 WB over HARRIET STREET (Route: 50)
Num:3102874x
Open: no restriction [A]
Built: 1966, Reconstructed: 2012
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46.3 m = 151.9 ft
Main Spans: 3 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 19.1 m = 62.7 ft (4 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 18.9 m = 62.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.7 MI W OF I75
Condition
Deck: Very Good [8]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 22589 (2015) and Trucks: 6%
Future ADT: 31354 (In 2038 )
GEST STREET over CIND RAILROAD (Route: 0)
Num:3161277x
Open: no restriction [A]
Built: 1919, Reconstructed: 1999
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 231 m = 757.9 ft
Main Spans: 1 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 8
700 N. OF INT.MEHR WY&GES
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 55.1 metric ton = 60.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2694 (1990) and Trucks: 1%
Future ADT: 3739 (In 2010 )
US50 EB over HARRIET STREET (Route: 50)
Num:3102882x
Open: no restriction [A]
Built: 1966, Reconstructed: 2012
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46.3 m = 151.9 ft
Main Spans: 3 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 18.8 m = 61.7 ft (4 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.7 MI W OF I75
Condition
Deck: Very Good [8]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 22589 (2015) and Trucks: 6%
Future ADT: 31354 (In 2038 )
US50 EB over GEST STREET (Route: 50)
Num:3103129x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 62.5 m = 205.1 ft
Main Spans: 3 at 27.7 m = 90.9 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 17.4 m = 57.1 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.2 MI W OF I75
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 24194 (2015) and Trucks: 6%
Future ADT: 33581 (In 2038 )
US50 WB over GEST STREET;US50*W RAMP (Route: 50)
Num:3103099x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 69.2 m = 227.0 ft
Main Spans: 3 at 27.7 m = 90.9 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 20.5 m = 67.3 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.2 MI W OF I75
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 24194 (2015) and Trucks: 6%
Future ADT: 33581 (In 2038 )
LINN STREET over IR75: GEST ST: WINCHELL (Route: 0)
Num:3109097x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 129.8 m = 425.9 ft
Main Spans: 7 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 21.3 m = 69.9 ft (6 Lanes) and Out-To-Out: 27.1 m = 88.9 ft for a 13.7 m = 44.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.5 MI N OF SR 264
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 10417 (2015) and Trucks: 5%
Future ADT: 14459 (In 2038 )
GEST ST RAMP R over GEST ST Median (Route: 0)
Num:3161358x
Open: no restriction [A]
Built: 1963, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 36.9 m = 121.1 ft
Main Spans: 3 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (1 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 8
East of Linn Street
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 51.8 metric ton = 57.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1000 (1991) and Trucks: 1%
Future ADT: 1388 (In 2011 )
I-75 7TH ST. over GEST ST WITHIN IR R/W (Route: 75)
Num:3109062x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 74.7 m = 245.1 ft
Main Spans: 4 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by State Highway Agency [01], DOT District: 8
.3 MI N OF SR 264DA
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 145897 (2015) and Trucks: 16%
Future ADT: 202505 (In 2038 )
GEST STREET RAMP S over Gest Street Median (Route: 0)
Num:3161366x
Open: no restriction [A]
Built: 1963, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 36.9 m = 121.1 ft
Main Spans: 3 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (2 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cincinnati [15000]: Hamilton County [061], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 8
West of Linn Street
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 58.3 metric ton = 64.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1000 (1991) and Trucks: 1%
Future ADT: 1388 (In 2011 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider