Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 29.3 m = 96.1 ft
Main Spans: 3 at 12 m = 39.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 30.47 m = 100.0 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Russell County [167], Kansas [20]
Owned by County Highway Agency [02], DOT District: 3
0.5SE OF LURAY
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Allowable Stress(AS) [2])
Inventory: 41.7 metric ton = 45.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 15 (2014) and Trucks: 0%
Future ADT: 35 (In 2040
)