Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 47.2 m = 154.9 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 38
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.1 m = 23.3 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Bourbon [07498]: Boone County [019], Missouri [29]
Owned by State Highway Agency [01], DOT District: 4
S 19 T 51 N R 13 W
Condition
Deck: Serious [3]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 9 / H 10 [1]
Operating: 18 metric ton = 19.8 tons (Load Factor(LF) [1])
Inventory: 10.8 metric ton = 11.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 3.4 km = 2.1 mi
Traffic
ADT: 222 (2019) and Trucks: 6%
Future ADT: 388 (In 2039
)