Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 15.8 m = 51.8 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.3 m = 14.1 ft (1 Lanes) and Out-To-Out: 4.4 m = 14.4 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Orrick [54956]: Ray County [177], Missouri [29]
Owned by County Highway Agency [02], DOT District: 3
S 24 T 51 N R 29 W
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 10.8 metric ton = 11.9 tons (Allowable Stress(AS) [2])
Inventory: 6.3 metric ton = 6.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 50 (2019) and Trucks: 10%
Future ADT: 68 (In 2039
)