HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


WATERVIEW AVE over MD 295: BW PARKWAY (Route: 1630)
Num:200000BC5402010x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.3 m = 128.9 ft
Main Spans: 2 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 21.4 m = 70.2 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.6 MI S OF I-95
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.5 metric ton = 80.9 tons ()
Inventory: 43.5 metric ton = 47.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 19170 (2007) and Trucks: 5%
Future ADT: 23390 (In 2027 )
ANNAPOLIS ROAD over WATERVIEW AVENUE (Route: 648)
Num:200000BC5407040x
Posted for load [P]
Built: 1920, Reconstructed: 1945
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 190.5 m = 625.0 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
WATERVIEW ANNAPO RD JCT
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 10 metric ton = 11.0 tons (Allowable Stress(AS) [2])
Inventory: 5.9 metric ton = 6.5 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 12
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 19950 (2007) and Trucks: 5%
Future ADT: 24885 (In 2028 )
RUSSELL STREET over CSX (Route: 295)
Num:200000BC5103010x
Open: no restriction [A]
Built: 1963, Reconstructed: 1977
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 64.6 m = 212.0 ft
Main Spans: 3 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 33.7 m = 110.6 ft (7 Lanes) and Out-To-Out: 34.9 m = 114.5 ft for a 29.6 m = 97.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.2 MI S OF I-95
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Critical [2]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.9 metric ton = 81.3 tons (Load Factor(LF) [1])
Inventory: 44.4 metric ton = 48.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 46276 (2016) and Trucks: 8%
Future ADT: 56466 (In 2036 )
MONROE STREET RAMP over CSX (Route: 295)
Num:200000BC5221010x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 63.1 m = 207.0 ft
Main Spans: 3 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 42
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.2 MI S OF IS 95
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.3 metric ton = 66.3 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 16520 (2007) and Trucks: 5%
Future ADT: 20155 (In 2027 )
IS 95 RAMP C over RUSSELL ST : MONROE ST (Route: 95)
Num:300000BCW539010x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 292.6 m = 960.0 ft
Main Spans: 7 at 53 m = 173.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 6.4 m = 21.0 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by State Toll Authority [31], DOT District: 4
Milepost M53.9
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11737 (2019) and Trucks: 6%
Future ADT: 15937 (In 2041 )
IS 95 RAMP A over RUSSELL ST (Route: 95)
Num:300000BCW536010x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 464.8 m = 1525.0 ft
Main Spans: 13 at 45.7 m = 149.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.9 m = 22.6 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 6.1 m = 20.0 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by State Toll Authority [31], DOT District: 4
Milepost M53.6
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.5 metric ton = 75.4 tons (Load Factor(LF) [1])
Inventory: 41.3 metric ton = 45.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6997 (2019) and Trucks: 2%
Future ADT: 9500 (In 2041 )
RELOCATED MONROE S over GWYNNS FALLS (Route: 43)
Num:200000BC5222010x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 55.2 m = 181.1 ft
Main Spans: 2 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 14.8 m = 48.6 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
MONROE ST & ANNAP RD
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 57.1 metric ton = 62.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 19110 (2016) and Trucks: 5%
Future ADT: 23310 (In 2036 )
IS 95 SB over RUSSELL ST - MD 295 (Route: 95)
Num:300000BCW538012x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 429.2 m = 1408.2 ft
Main Spans: 9 at 64 m = 210.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 213.6 m = 700.8 ft (4 Lanes) and Out-To-Out: 225.6 m = 740.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by State Toll Authority [31], DOT District: 4
IS 95 AT RUSSELL ST
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 106447 (2019) and Trucks: 8%
Future ADT: 141430 (In 2041 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider