REMINGTON AVENUE over STONEY RUN (Route: 2230)
Num:200000BC3456010x
Open: no restriction [A]
Built: 0, Reconstructed: 1930
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 1 at 7 m = 23.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 12.3 m = 40.4 ft (4 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.9 MI N OF NORTH AVE
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Critical [2]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4280 (2007) and Trucks: 5%
Future ADT: 5330 (In 2027 )
REMINGTON AVENUE over ABANDONED RAILROAD (Route: 2230)
Num:200000BC8017010x
Open: no restriction [A]
Built: 1901, Reconstructed: 1983
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 13.7 m = 44.9 ft
Main Spans: 1 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 31
Width, Roadway: 12.4 m = 40.7 ft (2 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
REMINGTON AV/ABANDONED RR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3954 (2015) and Trucks: 5%
Future ADT: 4825 (In 2035 )
SAN MARTIN DRIVE over STONEY RUN (Route: 1701)
Num:200000BC8016010x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 10.6 m = 34.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.5 MI N HOWARD & 29TH ST
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 66.2 metric ton = 72.8 tons ()
Inventory: 48.1 metric ton = 52.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2034 (2016) and Trucks: 5%
Future ADT: 2482 (In 2036 )
I-83 NB OFF RAMP over MD 25: FALLS RD (Route: 83)
Num:200000BC3110010x
Open: no restriction [A]
Built: 1960, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 25 m = 82.0 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 48
Width, Roadway: 9.8 m = 32.2 ft (1 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
OFF RAMP OVER FALLS RD
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 67.1 metric ton = 73.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 25265 (2013) and Trucks: 8%
Future ADT: 30829 (In 2033 )
CEDAR / WYMAN PARK over I-83 AND MTA (Route: 1701)
Num:200000BC3501010x
Open: no restriction [A]
Built: 1961, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Frame [07]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 133.2 m = 437.0 ft
Main Spans: 3 at 36 m = 118.1 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.1 m = 23.3 ft (2 Lanes) and Out-To-Out: 11.9 m = 39.0 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Baltimore [04000]: Baltimore city [510], Maryland [24]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.2 MI N 29TH ST
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 28326 (2016) and Trucks: 5%
Future ADT: 42091 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.