Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 63.7 m = 209.0 ft
Main Spans: 2 at 31 m = 101.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8 m = 26.2 ft (2 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Franklin County [047], Indiana [18]
Owned by County Highway Agency [02], DOT District: 5
00.10 S of BIG CEDAR S. R
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 85.3 metric ton = 93.8 tons (Load Factor(LF) [1])
Inventory: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 125 (2020) and Trucks: 5%
Future ADT: 150 (In 2040
)