Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 209.1 m = 686.1 ft
Main Spans: 3 at 97.8 m = 320.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.6 m = 51.2 ft (4 Lanes) and Out-To-Out: 15.6 m = 51.2 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 10.7 m = 35.1 ft
Location
Marietta [47628]: Washington County [167], Ohio [39]
Owned by County Highway Agency [02], DOT District: 10
Putnam Street: Marietta C
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6172 (2015) and Trucks: 2%
Future ADT: 8567 (In 2038
)