HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


Old NATIONAL Rd over CLEAR CREEK (Route: 0)
Num:8400172x
Open: no restriction [A]
Built: 1919, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28.1 m = 92.2 ft
Main Spans: 2 at 12.8 m = 42.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Albany [00802]: Vigo County [167], Indiana [18]
Owned by County Highway Agency [02], DOT District: 1
00.90 W THORPE RD
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Serious [3]
Loading
Design:
Operating: 40.8 metric ton = 44.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 322 (2017) and Trucks: 2%
Future ADT: 440 (In 2037 )
I-70 WB over CLEAR CREEK (Route: 70)
Num:41030x
Open: no restriction [A]
Built: 1964, Reconstructed: 2015
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 54.5 m = 178.8 ft
Main Spans: 3 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 11.8 m = 38.7 ft (2 Lanes) and Out-To-Out: 12.7 m = 41.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Vigo County [167], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
04.88 W US 41
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 75.3 metric ton = 82.8 tons (Load Factor(LF) [1])
Inventory: 44.4 metric ton = 48.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10845 (2010) and Trucks: 45%
Future ADT: 19640 (In 2030 )
I-70 EB over CLEAR CREEK (Route: 70)
Num:41020x
Open: no restriction [A]
Built: 1964, Reconstructed: 2014
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 54.5 m = 178.8 ft
Main Spans: 3 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 12.3 m = 40.4 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Vigo County [167], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
04.88 W US 41
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 75.3 metric ton = 82.8 tons (Load Factor(LF) [1])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10845 (2010) and Trucks: 45%
Future ADT: 14511 (In 2034 )
OLD US 40 EB over CLEAR CREEK (Route: 40)
Num:13551x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 49.6 m = 162.7 ft
Main Spans: 3 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 9.9 m = 32.5 ft (2 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Vigo County [167], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
00.50 E I-70
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 77.1 metric ton = 84.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 59 metric ton = 64.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2650 (2012) and Trucks: 4%
Future ADT: 2860 (In 2032 )
OLD US 40 WBL over CLEAR CREEK (Route: 0)
Num:13561x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 49.6 m = 162.7 ft
Main Spans: 3 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 9.9 m = 32.5 ft (2 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Vigo County [167], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
00.50 E I-70
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 77.1 metric ton = 84.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 59 metric ton = 64.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2550 (2012) and Trucks: 4%
Future ADT: 2750 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider