Bridge Type
Main Span(s): Concrete [1] Other [00]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 16.2 m = 53.2 ft
Main Spans: 1 at 15.6 m = 51.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.3 m = 14.1 ft (1 Lanes) and Out-To-Out: 4.6 m = 15.1 ft for a 4.3 m = 14.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Clark County [023], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 7
3.1 MI NE WESTFIELD
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 37.9 metric ton = 41.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 25 (2016) and Trucks: 8%
Future ADT: 54 (In 2032
)