Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 49.1 m = 161.1 ft
Main Spans: 3 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Concord [18154]: Fayette County [047], Ohio [39]
Owned by State Highway Agency [01], DOT District: 6
2.41 MI S OF US 35
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 4014 (2015) and Trucks: 13%
Future ADT: 5571 (In 2038
)