Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 199 m = 652.9 ft
Main Spans: 6 at 36 m = 118.1 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 12.1 m = 39.7 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 6.7 m = 22.0 ft
Location
Beverly [06222]: Washington County [167], Ohio [39]
Owned by State Highway Agency [01], DOT District: 10
0.32M S OF JCT SR60
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 68 metric ton = 74.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 3.1 km = 1.9 mi
Traffic
ADT: 6848 (2015) and Trucks: 10%
Future ADT: 9505 (In 2038
)