Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Corrugated Steel [6] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.3 m = 83.0 ft
Main Spans: 1 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (1 Lanes) and Out-To-Out: 4.9 m = 16.1 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Israel [37590]: Preble County [135], Ohio [39]
Owned by County Highway Agency [02], DOT District: 8
.30 S OF CH 45
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Serious [3]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 25.9 metric ton = 28.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 351 (2015) and Trucks: 7%
Future ADT: 487 (In 2038
)