Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 14.7 m = 48.2 ft
Main Spans: 2 at 7 m = 23.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Pike County [149], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
1.4 MI NE KINDERHOOK
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 58 metric ton = 63.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34.7 metric ton = 38.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 1300 (2019) and Trucks: 5%
Future ADT: 1110 (In 2032
)