Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 45.4 m = 149.0 ft
Main Spans: 3 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Kidder [38540]: Caldwell County [025], Missouri [29]
Owned by State Highway Agency [01], DOT District: 1
S 17 T 57 N R 29 W
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 40.5 metric ton = 44.6 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 4949 (2019) and Trucks: 36%
Future ADT: 10392 (In 2039
)