HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


FINDLAY STREET over MAD RIVER AND BIKE PATH (Route: 0)
Num:5761115x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 120.4 m = 395.0 ft
Main Spans: 3 at 39.9 m = 130.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 20.1 m = 65.9 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Dayton [21000]: Montgomery County [113], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 7
.2 MI S JCT SR 4
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 68 metric ton = 74.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 15043 (2015) and Trucks: 4%
Future ADT: 20880 (In 2035 )
SR-4 over STANLEY AVENUE (Route: 4)
Num:5700787x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 60.4 m = 198.2 ft
Main Spans: 4 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 15.7 m = 51.5 ft (2 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Dayton [21000]: Montgomery County [113], Ohio [39]
Owned by State Highway Agency [01], DOT District: 7
1.63MI.NE. OF JCT. SR-202
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 61.6 metric ton = 67.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 38.9 metric ton = 42.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11606 (2015) and Trucks: 7%
Future ADT: 16109 (In 2038 )
SR-4 over STANLEY AVENUE (Route: 4)
Num:5700817x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 60.4 m = 198.2 ft
Main Spans: 4 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 19.4 m = 63.7 ft (2 Lanes) and Out-To-Out: 20.8 m = 68.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Dayton [21000]: Montgomery County [113], Ohio [39]
Owned by State Highway Agency [01], DOT District: 7
1.63MI.NE. OF JCT. SR-202
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 61.6 metric ton = 67.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 38.9 metric ton = 42.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11606 (2015) and Trucks: 7%
Future ADT: 16109 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider