COMMERCE DRIVE over POGUE'S RUN (Route: 0)
Num:4900229x
Open: no restriction [A]
Built: 1958, Reconstructed: 2020
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 13.1 m = 43.0 ft (4 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.05 SE OF MASSACHUSETTS
Condition
Deck: Not Applicable [N]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 46.3 metric ton = 50.9 tons ()
Inventory: 43.5 metric ton = 47.9 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3445 (2019) and Trucks: 5%
Future ADT: 10072 (In 2039 )
12TH ST over POGUE'S RUN (Route: 0)
Num:4900232x
Open: no restriction [A]
Built: 1903, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14.2 m = 46.6 ft
Main Spans: 1 at 13.4 m = 44.0 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.05 E OF ARSENAL AVE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1649 (2019) and Trucks: 5%
Future ADT: 2451 (In 2039 )
I-70 EB over ROOSEVELT AV @ COMM AV (Route: 70)
Num:42410x
Open: no restriction [A]
Built: 1974, Reconstructed: 2007
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 47.5 m = 155.8 ft
Main Spans: 3 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 29
Width, Roadway: 26.8 m = 87.9 ft (5 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by State Highway Agency [01], DOT District: 3
05.74 W I-465
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 127164 (2004) and Trucks: 5%
Future ADT: 253312 (In 2032 )
I-70 WB over ROOSEVELT AV @ COMM AV (Route: 70)
Num:42420x
Open: no restriction [A]
Built: 1974, Reconstructed: 2007
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 47.5 m = 155.8 ft
Main Spans: 3 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 29
Width, Roadway: 26.8 m = 87.9 ft (5 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by State Highway Agency [01], DOT District: 3
05.74 W I-465
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 127164 (2004) and Trucks: 5%
Future ADT: 253312 (In 2032 )
10TH ST over POGUE'S RUN (Route: 0)
Num:4900224x
Open: no restriction [A]
Built: 1911, Reconstructed: 1978
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14 m = 45.9 ft
Main Spans: 2 at 6.2 m = 20.3 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.65 W OF JEFFERSON AVE
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.9 metric ton = 75.8 tons (Load Factor(LF) [1])
Inventory: 40.8 metric ton = 44.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14153 (2019) and Trucks: 5%
Future ADT: 21031 (In 2039 )
JEFFERSON AVE over POGUE'S RUN (Route: 0)
Num:4900225x
Open: no restriction [A]
Built: 1923, Reconstructed: 1981
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 12.3 m = 40.4 ft
Main Spans: 1 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 15.7 m = 51.5 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.35 N OF 10TH ST
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 54.4 metric ton = 59.8 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2060 (2019) and Trucks: 5%
Future ADT: 3061 (In 2039 )
I-70 WB over VALLEY AVENUE (Route: 70)
Num:42440x
Open: no restriction [A]
Built: 1974, Reconstructed: 2007
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 3 at 15.9 m = 52.2 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 26.8 m = 87.9 ft (5 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by State Highway Agency [01], DOT District: 3
05.34 W I-465
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 58 metric ton = 63.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 127164 (2004) and Trucks: 5%
Future ADT: 253312 (In 2029 )
I-70 EB over VALLEY AVENUE (Route: 70)
Num:42430x
Open: no restriction [A]
Built: 1974, Reconstructed: 2007
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 3 at 15.9 m = 52.2 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 26.8 m = 87.9 ft (5 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by State Highway Agency [01], DOT District: 3
05.34 W I-465
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 127164 (2004) and Trucks: 5%
Future ADT: 253312 (In 2029 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.