Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 26.8 m = 87.9 ft
Main Spans: 1 at 25.1 m = 82.4 ft
Approach Spans: 0
Skew: 28
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 9.3 m = 30.5 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Wayne County [177], Indiana [18]
Owned by County Highway Agency [02], DOT District: 3
0.2 MI S. OF HUNNICUT RD
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 50.8 metric ton = 55.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 47.2 metric ton = 51.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1948 (2017) and Trucks: 5%
Future ADT: 2626 (In 2037
)