HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


I-55 (SB) over SANGAMON AVE / IL 54 (Route: 55)
Num:84001400000000x
Open: would be posted or closed except for temporary shoring [D]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 73.3 m = 240.5 ft
Main Spans: 4 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 21.6 m = 70.9 ft (3 Lanes) and Out-To-Out: 22.5 m = 73.8 ft for a 21.6 m = 70.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
I-55/IL54 INT NE SPI
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 63.2 metric ton = 69.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 37.9 metric ton = 41.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21800 (2019) and Trucks: 23%
Future ADT: 15169 (In 2032 )
RIDGELY RD over I-55 (Route: 0)
Num:84010200000000x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 67.8 m = 222.5 ft
Main Spans: 4 at 20.6 m = 67.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.4 m = 24.3 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.5M S SANG AV/IL 54
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 70.6 metric ton = 77.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1100 (2012) and Trucks: 16%
Future ADT: 1179 (In 2032 )
I-55 (NB) over SANGAMON AVE / IL 54 (Route: 55)
Num:84001500000000x
Open: no restriction [A]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 73.3 m = 240.5 ft
Main Spans: 4 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 21.6 m = 70.9 ft (2 Lanes) and Out-To-Out: 22.5 m = 73.8 ft for a 21.6 m = 70.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
I-55/IL54 INT NE SPI
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 63.2 metric ton = 69.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 37.9 metric ton = 41.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21800 (2019) and Trucks: 23%
Future ADT: 15169 (In 2032 )
SANGAMON AV. (EB) over ILLINOIS CENTRAL RR (Route: 0)
Num:84051000000000x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 75.6 m = 248.0 ft
Main Spans: 3 at 33.2 m = 108.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.25M W I-55
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.8 metric ton = 83.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 45.7 metric ton = 50.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 18700 (2017) and Trucks: 7%
Future ADT: 11631 (In 2032 )
SANGAMON AV. (WB) over ILLINOIS CENTRAL RR (Route: 0)
Num:84051100000000x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 75.6 m = 248.0 ft
Main Spans: 3 at 33.2 m = 108.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 17.7 m = 58.1 ft (2 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.25M W I-55
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.1 metric ton = 83.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 45.7 metric ton = 50.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 18700 (2017) and Trucks: 7%
Future ADT: 11631 (In 2032 )
I-55 over HOOVER BRANCH (Route: 55)
Num:84200000000000x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7.8 m = 25.6 ft
Main Spans: 2 at 3.4 m = 11.2 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.85M S SANG AV/IL 54
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 97.2 metric ton = 106.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 97.2 metric ton = 106.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21800 (2019) and Trucks: 23%
Future ADT: 21708 (In 2032 )
I-55 (SB) over ILLINOIS CENTRAL RR (Route: 55)
Num:84001600000000x
Open: no restriction [A]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 74.5 m = 244.4 ft
Main Spans: 3 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 16 m = 52.5 ft (2 Lanes) and Out-To-Out: 19.9 m = 65.3 ft for a 19.9 m = 65.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.3M N IL 54/SANG. AV
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 65.1 metric ton = 71.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 39.2 metric ton = 43.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 16300 (2019) and Trucks: 28%
Future ADT: 15169 (In 2032 )
I-55 (NB) over ILLINOIS CENTRAL RR (Route: 55)
Num:84001700000000x
Open: no restriction [A]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 74.5 m = 244.4 ft
Main Spans: 3 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 19 m = 62.3 ft (2 Lanes) and Out-To-Out: 19.9 m = 65.3 ft for a 16 m = 52.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05480]: Sangamon County [167], Illinois [17]
Owned by State Highway Agency [01], DOT District: 6
.3M N IL 54/SANG. AV
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 69.3 metric ton = 76.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 41.5 metric ton = 45.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16300 (2019) and Trucks: 28%
Future ADT: 15169 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider