BridgeSeek

Nearby Bridges in NBI 2021: 3


TRACK OF CHAMPIONS over EAST TUNNEL (Route: 0)
Num:60565x
Open: no restriction [A]
Built: 1936, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 6.5 m = 21.3 ft
Main Spans: 1 at 6.5 m = 21.3 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by Other State Agencies [21], DOT District: 3
00.00 STATE FAIRGROUNDS
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 40.8 metric ton = 44.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 118 (2004) and Trucks: 5%
Future ADT: 166 (In 2030 )
38TH STREET over FALL CREEK (Route: 4274)
Num:4900140x
Open: no restriction [A]
Built: 1936, Reconstructed: 1956
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 120.4 m = 395.0 ft
Main Spans: 3 at 29.3 m = 96.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 25.8 m = 84.6 ft (7 Lanes) and Out-To-Out: 29.6 m = 97.1 ft for a 25.6 m = 84.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.45 W OF KEYSTONE AVENU
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: Other [C]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 19365 (2019) and Trucks: 3%
Future ADT: 28780 (In 2039 )
SERVICE ROAD over WEST TUNNEL (Route: 0)
Num:60560x
Open: no restriction [A]
Built: 1995, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14.9 m = 48.9 ft
Main Spans: 1 at 14.2 m = 46.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 6.7 m = 22.0 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by Other State Agencies [21], DOT District: 3
00.00 STATE FAIRGROUNDS
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49.9 metric ton = 54.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 40.8 metric ton = 44.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 133 (2004) and Trucks: 5%
Future ADT: 187 (In 2030 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.