Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 73.8 m = 242.1 ft
Main Spans: 2 at 33.5 m = 109.9 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 14.9 m = 48.9 ft (2 Lanes) and Out-To-Out: 19.2 m = 63.0 ft for a 14.9 m = 48.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Upper Chichester [78776]: Delaware County [045], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
1MILE WEST OF I-95 42J06
Condition
Deck: Serious [3]
Superstructure: Poor [4]
Substructure: Serious [3]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 41219 (2021) and Trucks: 6%
Future ADT: 42103 (In 2032
)