Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 139.6 m = 458.0 ft
Main Spans: 5 at 31.3 m = 102.7 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 16.6 m = 54.5 ft (4 Lanes) and Out-To-Out: 19.8 m = 65.0 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Indianapolis [36000]: Marion County [097], Indiana [18]
Owned by City or Municipal Highway Agency [04], DOT District: 3
00.24 W OF MERIDIAN STREE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 42581 (2019) and Trucks: 5%
Future ADT: 63270 (In 2039
)