Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 504.4 m = 1654.9 ft
Main Spans: 1 at 278 m = 912.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 18 m = 59.1 ft (4 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 18 m = 59.1 ft approaching roadway.
Vertical Clearance: 5.79 m = 19.0 ft and Navigational Clearance: 21 m = 68.9 ft
Location
Mead [48580]: Belmont County [013], Ohio [39]
Owned by State Highway Agency [01], DOT District: 11
AT OHIO R.BR. TO MDSVL WV
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 4.8 km = 3.0 mi
Traffic
ADT: 18000 (2018) and Trucks: 4%
Future ADT: 21600 (In 2038
)